As I’d told earlier that if I had still been alive, I probably would share with you about my stopover in Kedai Tenaga. Before I get started, I shall give you a brief definition about the place since it’s a new place name for some of my friends. Kedai (Shop) Tenaga is an office that supports electricity service to customers where contractors can make a new application/ change of tenant for electricity and Consumers can pay their bills and solve any electricity enquiry such as customer complaint.

During Week #6; I was still having a customer & services activity and I started to go on what I had left off from activities. I was having two remaining activities; Customer Serving and Billing & Account Activity.


1st: Customer Serving (Kedai Putrajaya):-

• New Application

A sheet form which the applicant who apply for electricity supply from TNB either developer, consultant engineer, electrical contractor or the tenant at different stages of the Supply Application Process. There two-type of application paper.

a) Application Form (Domestic Supply).

b) Application Form (Business Supply).

Both of forms are like similar but they are different in billing, here is a clear picture for the Domestic Supply form;




• Change of Tenant

The replacement consumer uses the same meter fas the previous consumers. The previous Consumer has to notify TNB about the change owing to avoid releasing the bill by the previous consumers’ names. Thus; there are three-type of application form;

a. Application Form (Move In). It is the same paper as new application

b. Application Form (Move Out).

c. Application Form (Move In & Move Out).

• Payment



There are two types of payment; new application payment & Billing.

• The Application Payment:-

Before install electricity to consumer; the contractor are giving 40 days for paying the deposit. If contractor doesn’t pay within mentioned days, the new application can’t be proceed and if the 40 days period passed, the new application would be disqualified. The main purpose of deposit is to begin work.

• Billing:-

The consumer should go to Kedai Tenaga to pay their electricity bill monthly. TNB also provides paying by bank or over online.

• Enquiry

Enquiry is an open service to customer giving the opportunity to make suggestions, recommendations or complaints in Kedai Tenaga. For instance; if consumer got any trouble with electricity supply; Customer Enquiry would check the situation and how to handle the problem in proper way. It’s really quite good ideas since TNB can improve their customer service and trying to apply one of the most common Shared Value in TNB plan; Customer First (`^o^`) ; looking to customer satisfaction.


2nd: Billing & Account (Kedai/Site):-

• Accounting Software (Using PC)

 Indicate about the address & meters no. of customers.





 Data that can be uploaded to the HHT device for Particular Purposes

• Hand Held Terminal (HHT).



 Upload the customer data
 Read the customer address.



 Scanner Meter Bar code Number.
 Type in the power consumption (KW/h) and Bill out.



 Distribute the Bill.

• Type of Customer

OPC (Ordinary Power Consumer).
LPC (Large Power Consumer).

• Type of Meter

 Electronic Meter.
 Mechanical Meter.

As I went for site with Kedai technicians; I’d seen that each of technicians’ duty was to meteorite approximately 74 customers per day; to scan, read power consumption and bill out. I just wonder that when registering the Power Consumption in KW/h on Hand Hat Computer device (HHC), the printer device on technician Belt would estimate the price directly and print the bill automatically without HHT is being wired. COOL (*o*) Here is a picture about it: -




<><><><><><><><><><><><><><><><><><><><><><><><><><><>

During Friday (21/5/2010); it was gathering talk for EPE Switchgear (M) Sdn Bhd. This talk made by EPE worker. The purpose of this talk is; to inform and guide TNB staff, particularly the maintenance team technician, about various types of Switchgear with different rated voltage. This talk was slightly different. It looked like as open conservation between the speaker & audiences. Audiences sometime discuss with the speaker about switchgear with various type of protection (VCB, SF6, Oil…). The speaker also recommended about “Maintenance Services” such as:-

• Preventive Maintenance.

• Corrective Maintenance.

• Condition Based Maintenance.

In spite of everything; this week was not much exposing about my engineering Electrical major. It was all about business & Accounting. In contrast; this activity taught me a lot about how essential of the electricity in our life. Particularly; it taught me that “the 21th century people are, indeed, demanding more electricity over and over years, they are not able to live without it which will definitely prove that the electricity company are really having increase in the number of customers as well as the company necessarily needs the protection system for the purpose of keep improving the business and maintenance issue” Besides; although the electricity consumption are increasing more and more; I learnt that “with saving the energy consumption of the electricity; we could use more power as well as reduce the cost of billing”.

Sunday, May 16, 2010

Week #5




By stepping down Voltage Twice from Main-Substation 33KV/11KV ---------> 11KV/415V, we shall see the Meter (*o*). I assume that everyone has seen the Meter since it is spread everywhere (Homes, Malls, Universities ect..). For this reason; I’m going to share with you one of the most common electricity equipment that you may see in your life.



During week #5, the activity that I had been through was; Customer & Services activity. This activity was not really simple and it does not have so much going for site but if they do, they just deliver the electricity bills, customer problem, installing meter & interrupt the electricity supply if it requested earlier from customers. In general; Customer, Services & Metering activity are divided into to three criteria; Metering, Billing & Account and Customer Servicing. During week #5; I was going out with technician for Metering (*o*)


Metering Activity:-

A) Installing Meter.



1. Type of Meter
>> Electronic Meter.

Reads more accurate and gives more details about power consumptions in different unit

>> Mechanical Meter.


Read less accurate than Electronic Meter and gives only one unit of power consumptiom.


2. Type of Customer
>> OPC (Ordinary Power Consumer). Customers which consume a low power electricity .


3. Meter conduct 240V

4. Secure the Meter & Fusion.

>>Cut-Out Fuse (R,Y,B,N) locked by Plastic Secure avoiding electricity interruption from consumer


B) Physical Check.

1. Reading and Recording the Power Consumption KW/h.



Measure and check current out to indicate alive cable


2. Type of Customer
>> OPC (Ordinary Power Consumer). Consumers whom has a low cability of consuming electrical power


3. Discuss with customer if complaint occurs.

4. Secure the Meter & Fusion (Mentioned Earlier) .

After all, It was not truly a complicated job but it spent so much time. As I observed that we needed to visit every assigned building to achieve any of those activities mentioned above earlier. Even though this work is not really a hard job nevertheless; it require someone memorize road and address of buildings & houses in such a way to fulfill a complete work simply.

$$$$$$$$$$$

During Thursday (13/5/2010); it was a busy day for the company. Everyone was in rush and there were a meeting then. I had also assigned to Kedai Tenaga technician and I made an appointment that I should come next Monday & Tuesday (17-18/5/2010) to Kedai Tenaga in Putrajaya in such a way to start one of the remaining activities (^_^). Just wait for me; if I have been staying alive next week, I probably would have exposed about it (*o*). –In Sha Allah-


During Friday (14/5/2010), it was also an important gathering. It was remaining the TNBD staff about Cleaning the Desk office since next Monday TNBD shall be visited to check about the office and cleaning. We, all trainees, have also notified that "before we leave, we have to keep the meeting room clear and tidy". Besides; two of my trainee friends named ‘Mohd Azim & Fiera Ismail’ had just done their practical training for six-months :-o . It was really having a great (/^o^\) and enjoyable time with them and it was little bit sad :-( because they left us. I wish them BEST OF LUCK.

At the End; I’d met my host supervisor En.Lokman Bin Yusoff and I asked him about one-title of project (*^o^*). That project was under his direction and He started to give me some information and clarification about the title so that I could see whether I would be able to achieve the project under him or I have to select another title (^^;). I hope that I could fulfill this project! –In Sha Allah-

Sunday, May 9, 2010

Week #4


Week 4 was an office week since I started to check out what I had been doing during the past four weeks. As a matter of fact, I begun to prepare and settle my weblog for the past four weeks as well as set my pre-report up even though I had just completed training for around four weeks, nevertheless I believed that it was better to begin before anything get accumulated. In this week, I’d also been getting acquainted more with my new friends (^_^). In other word; I started to get along with my new friends’ trainees since we, all trainees, had been shifted into meeting room and it became our courtyard. Therefore; I started to know them even more. Besides; I consulted about some clarifications about maintenance practice from technicians.


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

During Monday (3/5/2010); it was about Safety Presentation Talk to refresh and remind all staffs the essential of safety work and more importantly; the event was also concentrating about the great complete successfully Achievement Google Building in Cyberjaya. Since Google Building was supplied electricity 33KV with a complete and great protection system (/^o^\). The construction work, in general, had been done mostly during April 2010 and the supplement was begun on Sunday (2/5/2010).

During Wednesday (5/5/2010); it was also another gathering ordered by the General Manager (GM). The meeting was totally different from other. It was particularity for the trainee students. This meeting was only for reminding about discipline, policy, rule and regulation of company (TNBD). Furthermore; The GM had assigned the trainee practical a project. There were a 24 titles and the trainee must to select one and they had to get it done before the trainees ended up their training period and they would be giving acknowledgement and certification for complete project.

Furthermore; I’d been gone to Preventive Routine, this work is little bit similar to the maintaining routine for Substation Denominator Home (Main-substation). This time would on the Electrical Substation (Mini-substation).

1. Vacuum Circuit Breaker (VCB).
• Resistance test for the vacuum tank, the mechanism of switch breaker and oil the steel part to avoid Echo
2. Relay Device.
• Cable interconnection, test and troubleshoot.
3. Fault display.
• Test the Overcurrent Protection and Earth fault.
4. Cleaning.
• Wipe SG surface and blowing the dust.

*Here are some general photo about;




During Friday (7/5/2010); it’s a Friday Morning Talk. This ceremony was aiming to reward some staffs and introduced the new incomer trainees and some of new staff. This gather was really impressive since the GM started giving some gifts with certificates acknowledging the work of TNBD staffs. It was truly motivating behavior to encourage not only the other staffs but also the trainees to performance better during work. I wish I could get a opportunity like this before I leave! – In Sha Allah -


Sunday, May 2, 2010

Week #3


In this week 3#; it was really the longest week ever that I had never seen in my life (-o-) and there were new three trainees from UTM. They were just only for 10 weeks. They were having the same major like me.

However, third week; I can call it by The TWO-DAY Maintenance for 11kV Switchgear [Right & Left]. The right & left indicate to the Switch gear, transformer and feeder. In revision; the Substation Denominator Home (Main Substation) consists of (2-Switch gear, 2-transformer, 2-feeder) for both 11KV and 33KV. For this reason; the Left side indicate to the Switch gear 1, transformer 1 and feeder 1 and the Right side indicate to the Switch gear 2, transformer 2 and feeder 2.

During past days; I realized that the maintenance procedure could not be done quickly; it actually required more careful and concentration and it also couldn’t be fulfilled by one technician only. For instance; in order to shut down the Switchgear in every Electrical Substation (Mini-Substation) (11KV); we needed two technicians at least; one technician for safety (the one who is responsible for shutting down the switch gear since it is so risky (‘o’)) and the other technician for calling the Control Center to inform about the current situation.

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
At this moment; I shall tell you a brief description about how maintenance procedure happens (^_^). Maintenance Routine, in the whole general, happens up to the places, dates and times. Sometime this routien happens annually/every eighteen-month/3-month or 3 weeks for the purpose of maintain the machine. So that it can save the company a lot of money (^o^) as a replacement for wasting in buying a new machine (-_-). During my experiences (/^o^\), there were two aspect for maintaining; shut down the Switch gear at Electrical Substation (Mini-substation) and maintaining routine for Substation Denominator Home (Main-substation).

Firstly; shut down the Switch gear at Mini-substation:-

1. Need to have data sheet related to switchgear sequence indicating; no of switch gear, its location & its status.


2. Before shutting down; call to control center to alert about situation.
3. Safety technician is the one responsible for shutting down the switch gear.


Secondly; Maintaining routine for Main-substation:-
1. Vacuum Circuit Breaker (VCB).

• Resistance test for the vacuum tank, the mechanism of switch breaker and oil the steel part to avoid Echo


2. Relay Device. [Pic.]

• Cable interconnection, test and troubleshoot.


3. Fault display.
• Test the Overcurrent Protection and Earth fault.


4. Cleaning.
• Wipe SG surface and blowing the dust.

!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

During Friday (30/4/2010); there were two seminar programs. The 1st one was about the Aerobic program. It was on Morning. The GM, HR, Staff and all trainees were all involved. The program was all about to participate in some exercise to help the participant being healthy as well as to perform some company activity. This activity was really great (`^o^`) and interesting since you could see that the happiness :)) on face of all staffs and they were also having fun together and enjoying their time for some changes.

The 2nd one was for Health Talk Seminar. This seminar was about slides presentation guiding the staff about the type of food, TNDB statistic and Suggestion & Recommendation for health. The talk was useful and interesting. I ’ve even learned about how to keep your health for the purpose of not only to perform the work but also to have longer life. – In Sha Allah -

Sunday, April 25, 2010

Week #2



The 2nd week was little bit stressful but not like the 1st (*o*). It was within construction week. I’d been gone to many main substations in Putrajaya as well as helping the HR in filing some files during staying in the office. During 2nd week; I’d clarify about some general knowledge with the engineers and technicians so that I can understand about the electrical power major as well as comprehend about the electricity distribution system in both area Putrajaya & Cyberjaya. Here is an example about Low Voltage (LV):-


• 1-Phase, two wires (Small House)
V = 240V P=12KVA (Max. Demand)
I max = 50A (for fuse); usually small house use 30A.


• 3-Phase, Four-Wires (Big House)
V 3-Phase = 415V P=45KVA (Max. Demand)
I max = 62A (for fuse); usually big house use around 60A


• 3-Phase, Four wires (Mall or Very Big Building)
V 3-Phase = 415V P=1000KVA (Max. Demand)
I max = 1391.21A; Note that; we need to use C.T. (Current transformer) for the purpose of step current down!

**********************************************************

In your information; there are a lot of main substations throughout Putrajaya and Cyberjaya. Those substations consist of 33KV step down into 11KV through transformer.


The figure on the left site indicates about the existing 33KV Network at Putrajaya & Cyberjaya.






The picture on the right site indicate about 11KV & 33KV shut down tool and Warning Lift











In the whole general; the main substation are consisting of 3 main room; the Switch Gear room (33KV & 11KV) with RTCC (Remote Tap Changing Control) , Battery Room and Control Room.

The 11KV Switch Gear consis of 2 Feeder, 2 Transformer and Buses

The 33KV Switch Gear consist of 2 feeder, 2 Transformer and Buses.

The RTCC is used for preventing the transformer to flash or to get burnt.


The Battery Room used as feedback supply power

Control Room consist of feedback supply for both Switch Gear 11KV & 33KV

((((((((((((((((((((((((((((((((((((((((()))))))))))))))))))))))))))))))))))))))


During Thursday (22/4/2010); I’ve been requested by the Human Resource Department; particularly from Siti Elyana Ashari to attend a seminar called Majlis Pelan Caran Kempen Menana 26 juta Pokok done by YB DATO SRI. DOUGLAS UGGAH EMBAS in presient 4, 62574 Putrajaya. TNBD was involved with other company to farm a tree supporting to that program since the General Manager (GM) MOHAMAD ROSLI HUSSAIN and some TNBD staff was attended during that event. Here is my picture with the GM and TNBD staff (^^);



During Friday (22/4/2010); it’s was a meeting as well as discussing with my host supervisor or my mentor; En.Lokman Bin Yusoff about my Industrial Training Log Book. My mentor checked my log book out and made some comment about it. Besides; he recommended me to study and understand about the Overcurrent and Earth Fault since they are both important for Power System Protection as well as he lends me Power Engineer Guide Book from SIEMENS Company to read further about Power Protection (/^o^\).

Sunday, April 18, 2010

Week #1

In this weblog; you may wonder why I named by Industrial Training. In fact; Industrial Training (COEB314) is a subject giving by Universiti Tenaga Nasiona in Selangor, Malaysia; aiming to help the university student to expose as well as prepare for the real work place field which it probably will be a great experience after the graduation from university. The duration of the Industrial Training is from 5th April 2010 until 26th June 2010 which its duration around 12 weeks. Therefore; I’m going to share with you about my life and my general experience during 3 month of my real life. The fact that I hope that you probably will find out my achievement during my industrial training in TNBD (Tenaga Nasional Berhad Distribution) which is located in Putrajaya & Cyberjaya for period of three months.



The systematic of my weblog will tells you information that related what had been done during a week with providing some pictures which I also think it may be easier for reader to read and understand briefly about me. Before getting to the point, let me first introduce to you the company briefly that I’m training in (*o*).

Tenaga Nasional Berhad, TNB, is one of the largest companies throughout in Malaysia that registered under company act 1965 :)). TNB responsibilities are to generate transmit, distribute, sell energy to consumer through out peninsular Malaysia. TNB core’s activities are;

• Generation Division.
• Transmission Division.
• Distribution Division.

The Vision of TNB is to; Be among the leading corporations in energy and related businesses globally.
The Mission of TNB is; we are committed to excellence in our products and services.
The Shared Values of TNB is; our shared values provide us with a principle that will shape our business ethics and operations
•
Customer first (‘^o^’)
• Integrity
• Business Excellence $
• Caring

This company supplies electricity in strict accordance with the provision of the electricity supply act in 1990, licensee supply regulations 1990 and the electricity regulation 1994. TNBD, in general, divides its core activities into three main areas;

• Customer Services (CS)
• Network Service (NS)
• Support Services (SS)


The office work hour begins from 8:00am till 5:00pm which estimated around 40 hours per a week. TNBD works five days per a week. TNBD starts from Monday till Friday.

;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;


{After giving you a simple introduction about the TNBD; now I’d love to describe and share with you all about my training schedule. I had been scheduled to some activities that probably will be helpful in my industrial training such as construction, maintenance, customer services, planning and GIS/ Training Report. Each of these activities is divided into a specific period days that suited for three months practical. For instance; Construction Activity is specified period for two weeks and Planning Activity is also specific period for two weeks but GIS/ Training Report Activity is specified period for one-months and so on}.

During my first week; I’ve gone for site in Putrajaya & Cyberjaya with construction team technicians. Here are some pictures (*o*);

Going for site with consctruction Team technicain

Feeder Pillar 415V & Transformer 11KV -415V (Delta-Star) & Switch Gear 11KV

33KV Underground Cable 630mm2 (Al & Cu), it's coming Transmission substation heading to the main substation.

415V cable for the consumer. This cable width is 25mm2. it consists of 4-cable(R,Y,B,N) made of Al only and all of the cable were being isulated. The rubber is used to seperated the isulation from the 4- cable

Undergound Cabling Hall 33KV & 11KV, it's like a small hall under earth; consisting of various type of cables.

Cable identification used to indicate what is the live cable inside the under earth hall for the purpsre of cutting & jointing cable together.

Hydraulic Cutter is used to cut underground cable without being inside the underearth hall for the purpose of safety


During Friday (16/4/2010); it was meeting program called by Goodbye Ceremony. This meeting program involves discussing about the company work and rewarding the transfer staff from TNBD as well as introduces myself to the general manager, engineers and all staff. It was very nice program and I also had lunch together with all the staff. It was unforgettable day :)).


My first week was, indeed, excited and fun but it was very stressful week. After all, I’ve learnt about the installing underground cable, transformers, feeder Pillar, Type of fusion, Cable Identification System Device and Hydraulic Cutter Device............ Thanks Allah! (‘^o^’)