Sunday, April 18, 2010

Week #1

In this weblog; you may wonder why I named by Industrial Training. In fact; Industrial Training (COEB314) is a subject giving by Universiti Tenaga Nasiona in Selangor, Malaysia; aiming to help the university student to expose as well as prepare for the real work place field which it probably will be a great experience after the graduation from university. The duration of the Industrial Training is from 5th April 2010 until 26th June 2010 which its duration around 12 weeks. Therefore; I’m going to share with you about my life and my general experience during 3 month of my real life. The fact that I hope that you probably will find out my achievement during my industrial training in TNBD (Tenaga Nasional Berhad Distribution) which is located in Putrajaya & Cyberjaya for period of three months.



The systematic of my weblog will tells you information that related what had been done during a week with providing some pictures which I also think it may be easier for reader to read and understand briefly about me. Before getting to the point, let me first introduce to you the company briefly that I’m training in (*o*).

Tenaga Nasional Berhad, TNB, is one of the largest companies throughout in Malaysia that registered under company act 1965 :)). TNB responsibilities are to generate transmit, distribute, sell energy to consumer through out peninsular Malaysia. TNB core’s activities are;

• Generation Division.
• Transmission Division.
Distribution Division.

The Vision of TNB is to; Be among the leading corporations in energy and related businesses globally.
The Mission of TNB is; we are committed to excellence in our products and services.
The Shared Values of TNB is; our shared values provide us with a principle that will shape our business ethics and operations
Customer first (‘^o^’)
• Integrity
• Business Excellence $
• Caring

This company supplies electricity in strict accordance with the provision of the electricity supply act in 1990, licensee supply regulations 1990 and the electricity regulation 1994. TNBD, in general, divides its core activities into three main areas;

• Customer Services (CS)
• Network Service (NS)
• Support Services (SS)


The office work hour begins from 8:00am till 5:00pm which estimated around 40 hours per a week. TNBD works five days per a week. TNBD starts from Monday till Friday.

;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;


{After giving you a simple introduction about the TNBD; now I’d love to describe and share with you all about my training schedule. I had been scheduled to some activities that probably will be helpful in my industrial training such as construction, maintenance, customer services, planning and GIS/ Training Report. Each of these activities is divided into a specific period days that suited for three months practical. For instance; Construction Activity is specified period for two weeks and Planning Activity is also specific period for two weeks but GIS/ Training Report Activity is specified period for one-months and so on}.

During my first week; I’ve gone for site in Putrajaya & Cyberjaya with construction team technicians. Here are some pictures (*o*);

Going for site with consctruction Team technicain

Feeder Pillar 415V & Transformer 11KV -415V (Delta-Star) & Switch Gear 11KV

33KV Underground Cable 630mm2 (Al & Cu), it's coming Transmission substation heading to the main substation.

415V cable for the consumer. This cable width is 25mm2. it consists of 4-cable(R,Y,B,N) made of Al only and all of the cable were being isulated. The rubber is used to seperated the isulation from the 4- cable

Undergound Cabling Hall 33KV & 11KV, it's like a small hall under earth; consisting of various type of cables.

Cable identification used to indicate what is the live cable inside the under earth hall for the purpsre of cutting & jointing cable together.

Hydraulic Cutter is used to cut underground cable without being inside the underearth hall for the purpose of safety


During Friday (16/4/2010); it was meeting program called by Goodbye Ceremony. This meeting program involves discussing about the company work and rewarding the transfer staff from TNBD as well as introduces myself to the general manager, engineers and all staff. It was very nice program and I also had lunch together with all the staff. It was unforgettable day :)).


My first week was, indeed, excited and fun but it was very stressful week. After all, I’ve learnt about the installing underground cable, transformers, feeder Pillar, Type of fusion, Cable Identification System Device and Hydraulic Cutter Device............ Thanks Allah! (‘^o^’)

5 comments:

  1. Very Good Mr.Khaled

    ReplyDelete
  2. Thank you so much for supporting

    ReplyDelete
  3. Can I ask your industrial training report cause I'm lazy to do it

    ReplyDelete
  4. I cannot thank Mr Benjamin service enough and letting people know how grateful I am for all the assistance that you and your team staff have provided and I look forward to recommending friends and family should they need financial advice or assistance @ 1,9% Rate for Business Loan .Via Contact : .  247officedept@gmail.com. WhatsApp...+ 19893943740. Keep up the great work.
    Thanks, Busarakham.

    ReplyDelete